CT Pre-PO Passport

Before a risky listing becomes
a purchase order,
create a CT Passport.

Paste an eBay, broker or surplus listing URL. CT creates a Case ID, listing-risk record, evidence summary and manager approval trail — before the PO is issued.

Create Free CT Passport → View Sample Passport
CT reviews listing-level risk only. CT does not physically inspect or authenticate the part.
No account required for the first passport.
What you receive

The CT Passport — an audit-ready document.

CT Pre-PO Passport · Secondary-Market Risk Record CT-2026-000184
⚠️ VERIFY — Do not approve without seller evidence
Siemens CPU315-2PN/DP · 6ES7315-2EH14-0AB0 · $1,325
  • Price 223% above observed market range — verify before approval
  • Listing image appears across multiple listings with different MPNs
  • Seller signal: established, but lacking serial-level evidence
Exception type
Emergency downtime — authorized source lead time 8 weeks
Asset criticality
Production-critical — line-down
Manager decision
✅ Approve
❌ Reject
🔍 Request evidence
CT reviews listing-level purchase risk only. CT does not physically inspect, authenticate or certify the part. This Passport documents the pre-purchase decision process, not the physical condition of the item.
View full Sample CT Passport →
How it works

From risky listing to approved purchase record.

01 ——
Paste the listing

eBay URL, broker listing or surplus seller link. CT fetches and scans the listing automatically.

02 ——
CT scans risk signals

Price anomaly, seller legitimacy, image cross-reference, MPN consistency, condition ambiguity — all in seconds.

03 ——
CT Passport created

Case ID generated. Risk record, evidence summary and exception context logged. Manager receives approval email.

04
Attach to PO

Manager approves, rejects or requests seller evidence. Every action timestamped. Passport attaches to the PO.

What CT captures

Every exception, documented.

exception_type
Why authorized source is not used — no stock, lead time too long, obsolete part, emergency downtime, discontinued asset.
asset_criticality
Production-critical, line-down, safety-related, networked asset, maintenance spare — determines approval level required.
evidence_summary
What CT found: seller identity, image reuse, price deviation, condition claims, warranty terms, serial visibility.
risk_acceptance
Manager acknowledges explicitly: "I approve proceeding based on the attached CT listing-level risk record."
safer_source_search
CT notes whether alternative authorized or lower-risk sources were checked before proceeding with this listing.
outcome_log
After purchase: bought OK, returned, issue detected, seller failed evidence. This builds the dataset that makes CT smarter.
Get started

No exception PO without a CT Case ID.

Paste the risky listing. CT returns the Passport. First one is free.

Create Free CT Passport → Download Policy Template
CT reviews listing-level purchase risk only. CT does not physically inspect, authenticate or certify the part.
This is a pre-purchase listing review service for secondary-market industrial parts.